Job Timeline (Ref 21633-20)
Item Returned to Customer
A Timeline of this job can be seen below.
Arrived - 29-Apr-2024Fault Diagnosed
Remote Repaired
Payment Received
Returned - 16-May-2024
Repair Engineer : Martin Smith
LinkedIn Facebook
Please view complete details of this job on the rest of this page (scroll down if on a mobile)
Integra Velux Home KLR200 Remote Repair Details
Manufacturer : Integra Velux Home
Model : KLR200
Customers Fault Description : Screen freezes with no damage to the lcd screen. Once the batteries had run out and were replaced with new batteries, the device has been temperamental.
Remote Fixer Repair Response (see below) :
This Window Control arrived safely and on testing was found to have intermittent power. This was due to the battery terminals being loose.
The terminals were reworked and reinforced using solder, this restored full functionality.
Remote Images