Job Timeline (Ref 22547-20)
Item Returned to Customer
A Timeline of this job can be seen below.
Arrived - 03-Sep-2024Fault Diagnosed
Remote Repaired
Payment Received
Returned - 09-Sep-2024
Repair Engineer : Martin Smith
LinkedIn Facebook
Please view complete details of this job on the rest of this page (scroll down if on a mobile)
Sherbourne Remote Repair Details
Manufacturer : Sherbourne
Customers Fault Description : Wires are loose?.
Remote Fixer Repair Response (see below) :
This remote arrived safely and on inspection was found to have a damaged cable with 2 inner cores being open circuit.
A replacement straight cable was fitted (we cannot get the curly kind)
Remote Images