Job Timeline (Ref 21967-20)
Item Returned to Customer
A Timeline of this job can be seen below.
Arrived - 13-Jun-2024Fault Diagnosed
Remote Repaired
Payment Received
Returned - 24-Jun-2024
Repair Engineer : Martin Smith
LinkedIn Facebook
Please view complete details of this job on the rest of this page (scroll down if on a mobile)
Niagara Remote Repair Details
Manufacturer : Niagara
Customers Fault Description : wireing and 1 button
Remote Fixer Repair Response (see below) :
This remote arrived safely and on inspection the cable was damaged and there was liquid over parts of the PCB / Button array.
A replacement straight cable was fitted and then the PCB cleared of all contaminants. Then replacement conductive pads were glued into place.
Remote Images