Job Timeline (Ref 23876-20)


All repairs are fixed price at £20 plus postage
Item Returned to Customer


A Timeline of this job can be seen below.
Arrived - 06-Feb-2025
Remote Inspected
No Fault Found
Postage Payment Received
Returned - 10-Feb-2025
Repair Engineer : Martin Smith
LinkedIn Facebook
Please view complete details of this job on the rest of this page (scroll down if on a mobile)

G plan Elevate Remote Repair Details

Manufacturer : G plan

Model : Elevate

Customers Fault Description : hand control not working

Remote Fixer Repair Response (see below) :

This remote arrived safely and on inspection the case looked to have been opened before prior to arrival with us.

On opening a component can cable test was carried out but no issue could be found.


Remote Images

 G plan Elevate Remote Control - Front Image